...continued.....>



(above) While waiting for the aluminum to dry was a good time to see into the inverter…I pulled the monitor out in 30 seconds…





(above) Next, it was off with the cover…





(above) …then the faceplate…





(above) This is moving too…





(above) Pull those to reconnect the 120V…





(above) Perfect, the refreshed ideas about the battery compartment are coming together…





(above) Back to the aluminum channel…Drill out for mounting over the door…





(above) It feels like a lot is getting resolved today…Next, it was time to put the solar panel in like it is a skylight, not a refrigerator trim panel…





(above) The dual heater were cranking, the fiberglass was warm, time to reinstall…Towel dry everything…





(above) The weather was as good as it gets these days up here…





(above) Dabs of bedding silicone are laid down…





(above) Next a thick perimeter bead of silicone was laid out, then the solar panel was repositioned…





(above) All around, caulking was generously applied…





(above) Smoothed out and cleaned…





(above) Let it rain…





(above) As it looked at closing time…





(above) Just noticed a missing bolt…





(above) Finally, UPS brought this...


More later...